Portage la Prairie's seeing a lot of sidewalk work taking place lately. City director of operations Kelly Braden outlines the current projects.

"We are currently constructing some asphalt paths and concrete sidewalks. We have an asphalt path under c construction on 18th Street from McKay Avenue to Saskatchewan Avenue. And we have an asphalt walkway going in on the southside of Saskatchewan Avenue between 9th street SW and 12th Street SW."

He adds, "And we are preparing the construction of a concrete sidewalk on Gigot Avenue, from 18th Street and eventually it'll go to Fort la Reine School on 13th Street. And the other thing we're doing is we are widening the Fisher Avenue path, and we'll be paving is shortly from 8th Street to 18th Street."